This project delivers a new operational station at Waterloo International Terminal, reactivating platforms largely unused since Eurostar services relocated to St Pancras. The station includes Platforms 20-24, the Orchestra Pit Level for departures, the London Underground Level for arrivals, and a lower-level car park, all beneath a large-span roof.
The new Paddington Crossrail station forms part of the C405 Crossrail project, delivering a high-frequency, accessible railway for London and the South East. Built beneath Departures Road and Eastbourne Terrace, the station connects seamlessly to the existing Paddington station and includes two 240- metre platform tunnels with new eastern and western ticket halls.
The objective of the redevelopment scheme is to provide a new Public Transport Interchange (to include a bus lay-by at the front of the station), a new customer car park – located on the position of disused platforms
Five-storey residential apartment development with mixed-use specifications. The first floor was delivered to affordable housing standards, while the upper floors were completed to private sale specifications.
 The project required coordinated building services design to accommodate varying performance, cost, and regulatory requirements within a single development
The scheme delivers a purpose-built student accommodation building comprising 142 studios across seven storeys, incorporating a reception, communal lounge, and laundry facilities
Grade II listed refurbishment with new basement excavation and floor reconfiguration. Modernised educational facility while preserving heritage features and improving accessibility and energy efficiency
Luxury private villa with three
basement levels and three above-ground floors. Includes a private swimming pool, gym, secure underground parking with ramp and car lift, plant rooms, storage, and integrated building services.
Designed for privacy, natural light, and contemporary
living.
This is a multiple retail
store development at
various places across France. The project is a conversion to the existing 5 floors ‘Grade 2 listed’ building. The high end
redevelopment consists of sales areas, window- beds, cash tills, stock area, offices, canteen, WCs etc.
Three-storey educational facility with classrooms, library, science labs, dining, laundry, meeting rooms, and recreational spaces. Designed for flexible teaching, efficient circulation, and accessibility.
The proposed building is a new Control Building for National Grid that includes spaces such as offices, meeting rooms, telecommunication room, stores, toilets etc
A new, large six-floor college building designed to provide modern educational facilities across multiple levels. The building incorporates a range of renewable energy systems to significantly reduce its carbon footprint.
Clinical-stage genetic medicine facility involving specialist engineering support for regulated pharmaceutical and laboratory environments. The project required high-reliability building services infrastructure appropriate for research, development, and clinical operations, with consideration for compliance, redundancy, and operational continuity
This is a four floor traditional new building development consists of offices, WCs, a tea making
area etc. I was responsible for designing and delivering service system for the developer. The building and the services were designed to occupy either by a single or multiple tenets.
Copyright © 2026 Enesys – All Rights Reserved.